Bellefonte Nuclear Plant

AREVA, TVA Bellefonte Nuclear Plant (BLN) Construction Completion Project, Hollywood, AL. Seismic Equipment Qualification (SEQ) Group in charge of providing seismic structural engineering construction completion assessment of the SEQ Structures, Systems, and Components (SSCs). Prepared and reviewed Calculations, Design Basis, Design Criteria, and Specifications to comply with industry codes and standards. Performed component failure analysis. Investigated issues with the current design at the non-operating Nuclear Plant. Developed and presented a road map for the seismic structural qualification program to investigate and resolve current issues with the Site Specific Required Response Spectra (SSRRS) and the impact to the structures and equipment. Prepared and reviewed support modifications. Prepared Historic Open Item Resolutions. Prepared design packages, task plans, schedule, and budget estimates.